Edit 246827/03/2013Richard TurcoBlockPaving4Foil Machineadd hand holds/rail to foil machines and banderimprove access onto conveyor as conveyor hotspot survey point 4.10/4.11/4.12MechanicalMEDIUM   
Edit 246927/03/2013Richard TurcoBlockPaving4Lachenmier Machinereplace the infill strips along the chain conveyor from labeller to steps before baggerimprove access onto and along conveyor as conveyor hotspot survey point 4.28MechanicalHIGH   
Edit 247027/03/2013Richard TurcoBlockPaving4Banderscan fixed steps and a platform be made between the chain conveyor and lower station so access can be gained to the other side of the conveyorimprove access as conveyor hotspot survey point 4.32/4.33/4.36MechanicalMEDIUM   
Edit 247208/04/2013Pete ValenteBlockPaving3Batchingunder mixer door 2/3 there's a metal sheet deflecting material back into the hoppers instead of the mixer platform.These sheets need replacing pleasematerial forms into a large pile on platform and then falls back into hoppers causing lumps in the feedwagon and contamination and it takes longer to clean on pit stops and clean downsMechanicalMEDIUM   
Edit 247422/04/2013Brian BarkettOffline KBHLightingFit motion sencer light switches in denesco,from the clock end to the offline KBH department.H&S,so operators can see where they are going when resuming their shift (Sunday nights).ElectricalHIGH   
Edit 247516/05/2013Brian BarkettBlockPaving3BatchingColour pipe leaking.H&E,batch could be out of spec.MechanicalHIGH   